Spec the window.
See if it meets your target.

Dial in glass type, frame system, cavity fill, and spacer. The four performance metrics (U-value, SHGC, VT, and air leakage) recalculate in real time and check against the specification Catalyst recommends for Step Code 3 / 4 / 5. Those are our recommendations, not code requirements. The Building Code's own prescriptive ceiling is shown alongside. SHGC is an informational design input; the Step Code prescribes no SHGC range. Recommended Catalyst products at the bottom update with the spec.

Climate zones 4–7 Verified Oct 2026 against BCBC 2024 Code source BCBC 2024 Table 9.36.2.7.-A
UBC Museum of Anthropology, Vancouver. RAICO high-performance curved steel skylights, installed start to finish by Catalyst. View from the cafeteria looking out.

Configuration

Build the spec. The performance side updates as you go.

Performance

Compared against the specification Catalyst recommends for the Step you selected. The Building Code’s own prescriptive ceiling is shown alongside. They are not the same thing.

Catalyst spec for: BC Step Code 3
U-value
1.42W/m²K
Catalyst spec: ≤ 1.40 · Just below
Building Code ceiling: ≤ 1.84 (Zone 4, < 3000 HDD) · BCBC 2024 Table 9.36.2.7.-A
SHGC · solar heat gain (design input)
0.40
Suggested: 0.35 – 0.45 · In suggested range
VT · visible transmittance
0.70
Catalyst spec: ≥ 0.40 · Exceeds
Air leakage
0.20L/s·m²
Catalyst spec: ≤ 0.20 · A440 commercial

These are modelled figures for scoping, not test data. Before anything goes into a permit submission, confirm the numbers against the manufacturer's NFRC report and your energy advisor.

Meets our Step Code 3 recommendation

Suggested Catalyst products

1
Cortizo COR Vision Plus Sliding
U 0.90 SHGC 0.30 VT 0.50 Air 0.08
Meets all
Get a real quote with this spec

Code ceiling verified Oct 2026 against BCBC 2024 Table 9.36.2.7.-A. Step figures are Catalyst’s own spec guidance.

The code, and our line

What the Building Code requires, and what we’d spec.

The code sets a floor, and the Step Code scores the whole house instead of the window. Here is where those lines sit for the window, and where we would draw ours.

Who sets it Window U-value, lower is warmer Heat out, illustration
CodeBC Building Code ceilingPrescriptive route, Zones 4 and 5 (under 4,000 heating degree-days). Vancouver, Victoria and the Fraser Valley are in Zone 4. For permits applied for on or after 8 March 2024.
1.84W/(m²K)0.32 BTU/h·ft²·°F · R-3.1
52 W per m²
16 BTU/h per ft²
Provincial product ruleBC window standardWindows and sliding glass doors made since 2 January 2022, for residential buildings under four storeys or 600 m² (6,458 ft²) or less. It applies on top of the code.
1.61W/(m²K)0.28 BTU/h·ft²·°F · R-3.5
45 W per m²
14 BTU/h per ft²
Catalyst guidanceCatalyst, Step 3Where we start when a home is aiming at Step 3. Our figure, not a code figure.
1.40W/(m²K)0.25 BTU/h·ft²·°F · R-4.1
39 W per m²
12 BTU/h per ft²
Catalyst guidanceCatalyst, Step 4For homes where the city asks for Step 4. Our figure, not a code figure.
1.20W/(m²K)0.21 BTU/h·ft²·°F · R-4.7
34 W per m²
11 BTU/h per ft²
Catalyst guidanceCatalyst, Step 5Our line for the top Step. Our figure, not a code figure.
0.90W/(m²K)0.16 BTU/h·ft²·°F · R-6.3
25 W per m²
8 BTU/h per ft²
The gap is the point. From the code ceiling to our Step 5 line is 0.94 W/(m²K). In the illustration, that is about 26 W less heat lost through every square metre of window. That range is where comfort, condensation risk and heating load get decided.
Comfort

Warmer glass, fewer cold spots

A lower U-value keeps the room side of the window closer to room temperature, so there is less cold coming off it when you sit or stand beside it.

Dry glass

Condensation starts at the coldest spot

Water forms on the inside of a window wherever the surface is colder than the dew point of the room air. That can be the glass, the frame or the sash, whichever runs coldest, so we look at the whole window and not just the glass.

Heating load

Heat you never pay for

In the illustration, a square metre of window loses about 52 W at the code ceiling, 34 W at our Step 4 line and 25 W at our Step 5 line.

No dollar figures here. Your energy model puts a real number on it for your house, and we are glad to go through it with you.

The Step Code is not a window spec.

It scores the whole house with an energy model and an on-site airtightness test, and windows are one input to that model. Since 1 May 2023 the province’s floor for new houses is Step 3, though a city can accept the prescriptive route instead by bylaw. A city can also ask for more, and where it requires Step 4 or 5 for houses, the model route is the only route.

Try your window in the calculator

Sources, all from the Province of British Columbia. Code ceiling: BC Building Code 2024, Division B, Table 9.36.2.7.-A, which applies to permits applied for on or after 8 March 2024 (Bulletin B24-04). Climate zones are set by heating degree-days, Appendix C, Table C-2, of the same code. Colder zones carry lower ceilings: 1.61 in Zones 6 and 7A, 1.44 in 7B and 8. Elevation can move a site a zone colder, as Burnaby is listed at 2,735 degree-days in general and 3,100 at Simon Fraser University. Product rule: Bulletin B22-01. Step 3 floor and the prescriptive route: Bulletin B23-01. The Catalyst Step figures are our own guidance for a Zone 4 baseline (the calculator tightens them slightly in colder zones) and are not code requirements. Heat figures are an illustration only: U-value multiplied by a 28 °C (50 °F) difference, 21 °C inside and the Vancouver winter design temperature of −7 °C outside. They leave out air leakage and sun, and real windows vary.

Let’s get to work!

Upload drawings or photos. We'll review your scope against your energy target and come back within two business days with next steps and a realistic quoting timeline.